Radiant Withholding Public Disclosures
Radiant Withholding Public Disclosures

Radiant Withholding Public Disclosures

Scanning through Radiant pre-application documents (NRC Docket 99902106) at the Nuclear Regulatory Commission (NRC) we found:

  • Six documents related to Request for Withholding from Public Disclosure.  These are dated: July 2, 2025; July 7, 2025; August 14, 2025; September 4, 2025; September 18, 2025; and September 22, 2025.
  • The July 2, 2025 Radiant letter specifically requests withholding proprietary information from public disclosure for Radiant Industries LLC’s presentation titled: “RADIANT FACTORY SITING ASSESSMENT”
  • A September 30, 2025 CLOSED MEETING ANNOUNCEMENT for Radiant Environmental Review and Site Selection Update

It is unfortunate that Radiant is not forthcoming publicly on essential GEOLOGIC AND GEOTECHNICAL SITE CHARACTERIZATION INVESTIGATIONS FOR NUCLEAR POWER PLANTS required by the NRC.  In light of that, Natrona County residents may need to do their own exploration on the following topics:

Wyoming Groundwater
Groundwater in Natrona/Bar Nunn Area
Casper Creek-North Platte River drainage divide area landform origins in Natrona County Wyoming
Groundwater Circulation in Fault-Severed Madison Aquifer in the Casper Mountain Area
Wyoming Aquifers
North Platte River/Platte River Basin in Natrona/Bar Nunn Area
Water and Related Land Resources of the Platte River Basin

Casper Dune Field
Precambrian Geology of Casper Mountain Area, Natrona County
Casper Mountain Geology Area
Basic Seismological Characterization for Natrona County, Wyoming
Structural analysis of the Casper Mountain fault zone and surrounding area, Wyoming
Earthquakes in Wyoming (NRC)

« | »

Leave a Reply

Your email address will not be published. Required fields are marked *